Defining main prioritized remedial actions of maintenance using root cause analysis on mining equipment
Date
2022
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
GMIT
Abstract
Maintenance accounts for the largest portion of mining’s controllable operating cost. In this thesis, a methodology to define prioritized remedial actions for failures using FMEA, as rootcause analysis, is proposed, covering 4 main phases: Problem area identification, Downtime priority determination, Candidate equipment selection, Determination, and analysis (FMEA) of failure modes for selected equipment. The data used in the thesis was real-time data of Monnis Mining LLC, one of the Mongolian coal mining companies.