Defining main prioritized remedial actions of maintenance using root cause analysis on mining equipment
| dc.contributor.advisor | Manfred J. Hampe | |
| dc.contributor.advisor | Enkhzaya | |
| dc.contributor.author | Bilegsaikhan Sainbileg | |
| dc.date.accessioned | 2025-10-05T10:45:39Z | |
| dc.date.issued | 2022 | |
| dc.description.abstract | Maintenance accounts for the largest portion of mining’s controllable operating cost. In this thesis, a methodology to define prioritized remedial actions for failures using FMEA, as rootcause analysis, is proposed, covering 4 main phases: Problem area identification, Downtime priority determination, Candidate equipment selection, Determination, and analysis (FMEA) of failure modes for selected equipment. The data used in the thesis was real-time data of Monnis Mining LLC, one of the Mongolian coal mining companies. | |
| dc.identifier.uri | https://gmitlibrary.net/handle/123456789/77 | |
| dc.language.iso | en | |
| dc.publisher | GMIT | |
| dc.title | Defining main prioritized remedial actions of maintenance using root cause analysis on mining equipment | |
| dc.type | Thesis |