Browsing by Author "Supervisor 1: Mr. Nikita Abramov"
Now showing 1 - 1 of 1
- Results Per Page
- Sort Options
Item Design and Simulation of a Battery Energy Storage System for Peak Load Shaving in Mongolia(German-Mongolian Institute for Resources and Technology (GMIT), 2026) Munkhtsetseg, Buyanzaya; Supervisor 1: Mr. Nikita Abramov; Supervisor 2: Mr. Bold Enkhbold; Advisor Prof. Ariunbolor PurveeMongolia's power system faces increasing challenges due to rapid growth in electricity demand and pronounced daily and seasonal peak loads, particularly during evening hours and winter periods. The limited flexibility of existing generation, combined with reliance on electricity imports during peak demand, places significant operational stress on the system and raises concerns regarding reliability. Addressing peak demand has therefore become a critical priority for improving overall system stability and efficiency. This study investigates the application of a Battery Energy Storage System (BESS) for peak load shaving at the Nalaikh substation, part of the Central Energy System (CES), which supplies the majority of Mongolia's electricity demand. The Nalaikh substation is selected as a representative case study due to its role as an urban load center and the availability of real operational data. A simulation-based approach is developed using load data collected over four consecutive days (March 1-4). The model is implemented in Python using the pandapower framework to perform time-series analysis over a 24-hour period. A threshold-based control strategy is applied, where the BESS charges during low-demand periods and discharges during peak demand. Based on the load analysis, the BESS is designed with a power rating of 6 MW and an energy capacity of 30 MWh, operating within State of Charge (SOC) limits of 15% to 95%. Simulation results show that the system reduces peak load from 60.56 MW to 55 MW, corresponding to a reduction of 5.56 MW (9.2%). The load profile becomes smoother, and the load factor increases from 88.42% to 96.84%, indicating improved system utilization. The results confirm that BESS is a practical and effective solution for peak load management at the substation level. The proposed system enhances grid flexibility, reduces operational stress, and improves the efficiency of the power system.