Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "1 st Supervisor: Ph.D. Nikita Abramov"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Implementation of Microgrid at GMIT Campus:
    (GMIT, 2025) MUNKHTUSHIG Amarsanaa; 1 st Supervisor: Ph.D. Nikita Abramov; 2 nd Supervisor: Mr .Bold Enkhbold
    This thesis presents the design, feasibility analysis, and implementation proposal of a hybrid microgrid system for the German-Mongolian Institute for Resources and Technology (GMIT) campus, integrating solar photovoltaic (PV), wind energy, and battery energy storage systems (BESS). The primary objective is to enhance energy security, reduce dependence on Mongolia’s coal-dominated national grid, and offer a sustainable, cost-efficient, and educationally valuable energy solution. By assessing the campus’s electricity demand—using 2023 and 2024 billing data—and aligning it with locally available renewable resources, the study proposes a technically feasible and economically viable microgrid architecture tailored to GMIT's needs. And because data is minimal, I simulated my data for consumption, wind energy, but used an official educational site for my PV systems generation at a certain location. The proposed system includes a 200 kW PV array utilizing high-efficiency monocrystalline modules and a contract-based connection to the nearby Salkhit Wind Farm to access clean wind power. The total system pays itself from 5.652872-9.00485 years, but the system is expected to pay itself much faster, because the microgrid saves more money, the more energy our campus consumes. And also the typical payback cost for a microgrid with BESS is from 7 to 12 years. Supporting infrastructure costs—including inverters, mounting, wiring, transformers, and HVAC systems—are detailed, and life-cycle costs are projected over 20–25 years(with a minimum 10-year warranty).

DSpace software copyright © 2002-2026 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify